New Catch Basin & Concrete

New Catch Basin & ConcreteNew Catch Basin & ConcreteNew Catch Basin & ConcreteNew Catch Basin & Concrete

This job at a chemical plant called for removing concrete that was in a state of dis-repair, as well as removing an old catch basin. ICS’s concrete crew then installed a new catch basin, new piping, and poured the new concrete pitched toward the basin. We installed a heavy duty grate on top of the basin to allow for forklift traffic.